Use a temporary gap to indicate that no member is assigned to cover part or all of a shift. You can add multiple temporary replacement periods to the same shift. Y
You can add a temporary replacement from 72 hours before the shift starts until 72 hours after it starts. The replacement period must fall within the original shift's start and end times.
- Open the scheduling dashboard and select the shift.
- Select Add a temporary replacement.
- In the Add a temporary replacement panel, enter the Start time, End time, and Details for the temporary gap.
- Leave the member selection empty.
- Select Add.
- In the confirmation message, select Add again. The system adds a Temporary Gap label and a temporary replacement icon to the shift tile. While the temporary gap is active, a red indicator displays the end time of the gap.